You asked: How do you set a location in Revit?

How do you change coordinates in Revit?

Help

  1. Click Annotate tab Dimension panel (Spot Coordinate).
  2. In the Type Selector, select the type of spot coordinate to place.
  3. On the Options Bar, select or clear Leader. …
  4. If you want the elevation to display in addition to the spot coordinates, do the following: …
  5. Select an edge of an element or a point on a toposurface.

7 февр. 2017 г.

How do you show coordinates in Revit?

Display Coordinate Origin Points

  1. Open the desired view.
  2. Click View tab Graphics panel (Visibility/Graphics).
  3. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it.
  4. To display the project base point, select Project Base Point.
  5. To display the survey point, select Survey Point.

21 янв. 2021 г.

How do you set units in Revit?

Set Project Units

  1. Click Manage tab Settings panel Project Units.
  2. In the Project Units dialog, select the discipline.
  3. Click the value in the Format column to change the display value for that unit type. …
  4. Specify Units, if necessary.
  5. For Rounding, select an appropriate value. …
  6. For Unit symbol, select an appropriate option from the list.
IT IS INTERESTING:  Question: How do I find the view range in Revit?

6 дек. 2020 г.

How do you georeference in Arcgis pro?

In the Contents pane, click the source raster layer you want to georeference. Click the Imagery tab and click Georeference to open the Georeference tab. The tools on the Georeference tab are divided into several groups to help you use the correct tools in the different phases of your georeferencing session.

What is Survey point in Revit?

The survey point provides a real-world context for the Revit model. It represents a known point in the physical world, such as a geodetic survey marker or the intersection of 2 property lines. … In a Revit model, the survey point defines a reference point for the survey coordinate system.

How do I relocate a project in Revit?

Relocate the Model

  1. Click Manage tab Project Location panel Position drop-down (Relocate Project). The Relocate Project tool works similar to the Move tool. As you move the cursor over elements, valid references are highlighted and identified in the status bar.
  2. Move the project graphically in the view.

21 янв. 2021 г.

What is Project base point in Revit?

The project base point defines the origin (0,0,0) of the project coordinate system. Use the project base point as a reference point for measurements across the site. The survey point identifies a real-world location near the model, such as a corner of the project site or the intersection of 2 property lines.

How do you hide coordinates in Revit?

To hide internal origin in the views, use one of the following options

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. Click Browse to folder and select the local folder with the Dynamo script.
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.
IT IS INTERESTING:  How do you do energy analysis in Revit?

3 янв. 2021 г.

How do you add a level in Revit?

Go to Project Browser and double click on the section/elevation view to add levels.

  1. Click Home tab → Datum panel → Level. ( Keyboard shortcut ‘LL’)
  2. Place the cursor in the drawing area and click. …
  3. Draw level lines by moving the cursor horizontally.
  4. Click when the level line is of correct length.